All the DCO application documents, including the Consultation Report, can be accessed on the Planning Inspectorate’s website here.
Copies of all the other documents relating to Tillbridge Solar can be found below. You can continue to view documents from our latest targeted consultation (December 2023 to January 2024) our PEI Report and wider information made available as part of our statutory consultation (May – July 2023). You can also view out latest Community Newsletter, which was distributed both electronically and by post in March 2024.
Targeted statutory consultation – December 2023 to January 2024
2023 - Statutory consultation documents
Preliminary Environmental Information Report
Tillbridge Solar PEI Report Non Technical Summary
Volume I
- Chapter 0 Contents Glossary
- Chapter 1 Introduction
- Chapter 2 Scheme Location
- Chapter 3 Scheme Description
- Chapter 4 Alternatives and Design Evolution
- Chapter 5 EIA Methodology
- Chapter 6 Air Quality
- Chapter 7 Climate Change
- Chapter 8 Cultural Heritage
- Chapter 9 Ecology and Nature Conservation
- Chapter 10 FR, Drainage and SW
- Chapter 11 Human Health
- Chapter 12 Landscape and Visual Amenity
- Chapter 13 Noise and Vibration
- Chapter 14 Socio-economics and Land Use
- Chapter 15 Transport and Access
- Chapter 16 Other Environmental Topics
- Chapter 17 Cumulative Effects
- Chapter 18 Summary of Significant Environmental Effects
Volume II
- Volume II Front Cover and Contents
- Appendix 1-1 EIA Scoping Report
- Appendix 1-2 Scoping Opinion
- Appendix 1-3 Statement of Competence
- Appendix 3-1 Framework CEMP
- Appendix 3-2 Outline LEMP
- Appendix 3-3 Outline Battery Fire Safety Management Plan
- Appendix 6-1 Dust Risk Assessment
- Appendix 8-1 Cutural Heritage Desk-Based Assessment
- Appendix 9-1 Ecology Legislation and Policy
- Appendix 9-2 Preliminary Ecological Appraisal
- Appendix 9-3 Aquatic Ecology Baseline Report
- Appendix 9-4 Survey Report for Breeding Birds
- Appendix 9-5 Badger Survey Report
- Appendix 9-6 Habitat Regulations Assessment Screening
- Appendix 10-1 Water Framework Direcitve Assessment
- Appendix 10-2 Preliminary Flood Risk Assessment
- Appendix 10-3 Preliminary Drainage Strategy
- Appendix 11-1 Human Health Legislation and Policy
- Appendix 12-1 LVIA Legislation and Policy
- Appendix 12-2 LVIA Methodology
- Appendix 12-3 LVIA Landscape Baseline
- Appendix 12-4 LVIA RVD
- Appendix 12-5 LVIA AoLE
- Appendix 12-6 LVIA Assessment of Visual Effects
- Appendix 13-1 Noise and Vibration LegislPol
- Appendix 13-2 Acoustic Terminology
- Appendix 13-3 Baseline Noise Survey
- Appendix 13-4 Noise Modelling
- Appendix 14-1 Socio-eco and Land Use LegislPol
- Appendix 14-2 Interim Agricultural Land Classification Survey
- Appendix 15-1 Transport Assessment
- Appendix 15-2 Framework CTMP
- Appendix 16-1 Glint and Glare Assessment
- Appendix 16-2 Principal Site PRA
- Appendix 16-3 Preliminary Risk Assessment for Cable Route Corridor
Volume III
- Volume III Front Cover
- Figure 2-1 Scheme Location
- Figure 2-2 Environmental Constraints Plan
- Figure 3-1 Indicative Site Layout Plan
- Figure 3-2 Proposed HDD Crossing Assumptions
- Figure 4-1 Comparison of Scheme Boundaries
- Figure 6-1 Baseline AQ Monitoring Locations
- Figure 6-2 Dust Risk Assessment Zones
- Figure 8-1 Designated Heritage Assets
- Figure 8-2 Non-designated Heritage Assets
- Figure 8-3 Archaeological Events
- Figure 8-4 Historic Landscape Character
- Figure 9-1 Statutory Designated Sites for Nature Conservation
- Figure 9-2 Non-Statutory Sites Nature Conservation
- Figure 9-3 Phase 1 Habitat Map
- Figure 10-1 Surface Water Features
- Figure 10-2 Groundwater Features
- Figure 10-3 Bedrock and Superficial Geology
- Figure 10-4 Watercourses, Flood Zones and IDBs
- Figure 12-1 Example Initial Site Appraisal Plan
- Figure 12-2 Example Site Contraints-Opportunities Plan
- Figure 12-3 Study Area
- Figure 12-4a ZTV Panels Bare Earth
- Figure 12-4b ZTV Panels Barriers
- Figure 12-4c ZTV Solar Stations Bare Earth
- Figure 12-4d ZTV Solar Stations Barriers
- Figure 12-4e ZTV Substation 1 Bare Earth
- Figure 12-4f ZTV Substation 1 Barriers
- Figure 12-4g ZTV Substation 2 Bare Earth
- Figure 12-4h ZTV Substation 2 Barriers
- Figure 12-5 Topography and Watercourses
- Figure 12-6 Designations
- Figure 12-7 PROW
- Figure 12-8 National Character Area
- Figure 12-9 Regional Character Area
- Figure 12-10 County and District Landscape Character Areas
- Figure 12-11 Draft Local LLCA
- Figure 12-12 Viewpoints
- Figure 12-13 Type 1 Representative Views
- Figure 13-1 Noise Sensitive Receptors
- Figure 15-1 Transport and Access Study Area
- Figure 15-2 Local Highway Network
- Figure 15-3 Local PRoW Network
- Figure 15-4 Traffic Survey Locations
- Figure 15-5 PIC Study Area
- Figure 15-6 Site Access Plan (Principal Site)
- Figure 17-1 230314 Cumulative Figures Air Quality
- Figure 17-2 230314 Cumulative Figures Cultural Heritage
- Figure 17-3 230314 Cumulative Figures Ecology
- Figure 17-4 230314 Cumulative Figures Water Resources
- Figure 17-5 230314 Cumulative Figures Landscape and Visual
- Figure 17-6 230314 Cumulative Figures Noise
- Figure 17-7 230314 Cumulative Figures Socio Economics and Land Uses
- Figure 17-8 230314 Cumulative Figures Transport and Access New